B2 – Overhead lines

Chairman: Gordan Mirošević, dipl. ing. el.
Secretary: Goran Čubra, dipl. ing. el.

Expert reporters:

  • Sanja Vinter, dipl. ing. el.
  • dr.sc. Srećko Bojić dipl.ing.el

B2-01 Velimir Ilijanić, Alan Župan, Joško Moser, Marija Žmire

HOPS SPATIAL-INTEGRATION SYSTEM

B2-02 Nenad Gubeljak, Viktor Lovrenčić, Matej Kovač, Bojan Banić

SYSTEM FOR ON-LINE MONITORING OF CONDUCTOR ELONGATION FOR PREVENTION OF EXCESSIVE SAG ON CRITICAL LOCATION IN SPAN

B2-03 Igor Ivanković, Alan Župan, Goran Levačić, Dean Dobrec, Boris Avramović, Ivan Pavičić

PROTECTION OF OVERHEAD LINES FROM DIRECT STROKES

B2-04 Sanja Vinter, Milivoj Šutej, Marin Ištvanović

TEMPORARY CONNECTION BETWEEN OHTL 2×220 kV PEHLIN – PLOMIN AND OHTL 220 kV DIVAČA – PEHLIN

B2-05 Silvia Piliškić, Goran Levačić, Dalibor Škarica, Luka Ćurin

EXPERIENCE OF THE LINE SURGE ARRESTERS APLICATION ON OVERHEAD LINES IN CROATIAN TRANSMISSION NETWORK

B2-06 Srećko Bojić, Dalibor Škarica, Branko Ćosić, Goran Čubra, Milivoj Šutej

CONDITION AND INSULATING PROPERTIES OF COMPOSITE INSULATORS FOR COASTAL REGION TRANSMISSION LINES DUE TO LONG TERM EXPOSURE TO SALT POLLUTION

B2-07 Neven Vujičić, Stipe Lelas, Mate Kutleša, Marin Ištvanović, Marko Nevistić, Mladen Penava

APPLICATION OF EMERGENCY RESTORATION TOWER IN REPUBLIC OF CROATIA

B2-08 Josip Srdanović, Dinko Marijan, Domagoj Milun

DEPARTMENT FINDINGS – METHODS FOR PREVENTION OF DAMAGE CAUSED BY POLUTION ON THE POWER LINES ABOVE THE GROUND

B2-09 Ervin Černetić, Hrvoje Bulat, Ratko Ivković

RESTORATION OF THE LEFT BANK OF THE OLD DRAVA RIVER IN ORDER TO SECURE THE TRANSMISSION LINE TOWER No. 45 OF OHL 110 Kv KOPRIVNICA-HE DUBRAVA

B2-10 Sanja Vinter, Igor Lukačević, Kristian Horvath, Kristijan Pavić

ANALYSIS OF THE OHTL 110 kV NAŠICE-DONJI MIHOLJAC BREAKDOWN

B2-11 Goran Čubra, Toni Pavić

FAILURES CAUSED BY WIND ON OVERHEAD LINES OF 110 kV TRANSMISSION NETWORK HOPS, PrP SPLIT

B2-12 Viktor Lovrenčić, Primož Ribič, Robert Maruša, Rado Ferlič

SAFE WORK IN THE VICINITY OF LIVE PARTS ON HIGH VOLTAGE DOUBLE-CIRCUIT TRANSMISSION OVERHEAD LINES ON ELES GRID

B2-13 Zvonimir Zegnal, Matija Kršić

RECONSTRUCTION OF THE TRANSMISSION LINE 110 kV SLAVONSKI BROD-SLAVONSKI BROD 2 — ON THE PROBLEMS OF CROSSING OVER INFRASTRUCTURE FACILITIES

B2-14 Srećko Bojić, Domagoj Božić, Branko Ćosić, Dalibor Škarica, Ivo Uglešić, Božidar Filipović-Grčić

THE IMPORTANCE OF KNOWING FREQUENCY DEPENDANT GROUNDING IMPEDANCE OF TRANSMISSION LINE TOWER

B2-15 Mateja Kaurloto, Toni Pavić, Boris Kaurloto

THE JUSTIFICATION FOR THE USAGE OF THE NEW GENERATION OF ACCC CONDUCTORS ON OVERHEAD TRANSMISSION LINES LOCATED IN ZONES WITH HIGH WINDS AND CONCENTRATED LOADS

B2-16 Goran Čubra

REVITALIZATION OF A 110 kV OVERHEAD LINE BETWEEN 110 KV SUBSTATIONS TS METERIZE, TS DUJMOVAČA, TS VRBORAN

B2-17 Tibor Dolenc, Vitomir Komen, Filip Jelavić, Zoran Rubinić, Domagoj Hart

ANALYSIS OF THE AC TO DC TRANSFORMATION POSSIBILITIES

B2-18 Melita Perčec Tadić, Renata Sokol Jurković

ICE LOAD MAP FOR NATIONAL (NORMATIVE) ANNEX HRN EN 50341-1:2013

B2-19 Zoran Rubinić, Dragutin Mihalic, Gordan Mirošević, Dalibor Škarica, Mario Križić, Goran Majstrović

ANALYSIS OF APPLICATION OF STANDARD HRN EN 50341-1: 2013 IN DESIGN, CONSTRUCTION AND MAINTENANCE OF OVERHEAD LINES AND THE NEED FOR CREATION OF NATIONAL NORMATIVE ASPECTS FOR THE REPUBLIC OF CROATIA