B3 – Substations and electrical installations

Chairman: Zdravko Šojat, dipl. ing. el.
Secretary: Branimir Đikić, dipl. ing. el.

Expert reporter:

  • Branimir Đikić, dipl. ing. el.

B3-01 Zoran Augustinović, Ivan Levar

A CONSTRUCTION OF THE NEW S/S ORIKUM AND NEW S/S HIMARE IN ALBANIA

B3-02 Krešimir Starčević, Mladen Piteša, Mladen Čuljak, Hrvoje Čop

REPLACEMENT OF 35 kV SWITCHGEAR AT SS 110/35/20/10 kV KRASICA

B3-03 Tomislav Radošević, Aleksandra Stojisavljević, Zoran Subotičanec, Domagoj Rubić, Krunoslav Turk

TEMPORARY POWER SUPPLY OF 110/35 kV PRAČNO SUBSTATIONDURING 110 kV SWITCHGEAR RECONSTRUCTION

B3-04 Dragan Ljubičić, Hrvoje Bulat, Tomislav Stjepandić

RECONSTRUCTION OF SUBSTATION 110/35 KV KOPRIVNICA BY THEESTABLISHMENT OF PROVISIONAL POWER SUPPLY

B3-05 Sonja Ravlić Begić, Velimir Ravlić, Neven Lang Kosić, Mario Pernar

CONSTRUCTION OF SS 110/10 (20) kV KRŠNJAVOGA (UKLOPNA I)

B3-06 Ivica Pavić, Zdravko Šojat, Branimir Đikić, Damir Mišćenić

PHASE SHIFTING TRANSFORMERS APPLICATION

B3-07 Darko Biuk, Filip Plećaš, Igor Mladinić

SS 110/35kV OPUZEN – PLANT RECONSTRUCTION

B3-08 Velimir Ravlić, Ante Ravlić

UPRATING OF EXISTING SUBSTATIONS BY THE USE OF THERMO-RESISTANT ALUMINIUM ALLOY CONDUCTORS

B3-09 Igor Ivanković, Goran Levačić, Alan Župan, Dean Dobrec

OPERATIONAL EXPERIENCES AND POSSIBLE IMPROVEMENTS OF SURGE ARRESTER MAINTENANCE IN HIGH VOLTAGE SUBSTATIONS

B3-10 Igor Ivanković, Goran Levačić, Alan Župan, Dean Dobrec

RECONSTRUCTION OF THE 400 kV BUSBAR SYSTEMS IN THE SUBSTATIONS400/110/30 kV TUMBRI

B3-11 Tomislav Radošević, Tihomir Pavlović

TEMPORARY POWER SUPPLY OF 110/35 kV IVANIĆ GRAD SUBSTATIONDURING 110 kV SWITCHGEAR RECONSTRUCTION

B3-12 Robert Lindič, Rok Judnič, Aleš Zagoričnik, Robi Maruša, Drago Pavlič, Darko Bordon

CONSTRUCTION OF THE TRANSFORMATION 400/110 kV AT THESUBSTATION 400/220/110 kV PODLOG

B3-13 Kristian Lazarić, Damir Miščenić, Aleksandar Šuša, Dean Dobrec

REPLACING OF 150 MVA POWER TRANSFORMER IN SUBSTATION PEHLIN 220/110/35 kV

B3-14 Nikša Vrkić, Davor Bojić, Joško Svalina, Šime Šimurina, Željko Ćosić, Branimir Đikić

RECONSTRUCTION OF SELF-SUPPLY SYSTEM IN RHPP VELEBIT

B3-15 Katarina Musulin, Hrvoje Bulat, Mario Jurić, Ivan Petrić

SERVICE CONTINUITY CONCEPTS FOR EL-TO ZAGREB GIS DURING MAINTENANCE, REPAIR, EXTENSION AND HIGH VOLTAGE DIELECTRIC TEST ON SITE

B3-16 Mihovil Ivas

QUALITY ASSURANCE OF CONSTRUCTION PROJECTS IN POWER SECTOR THROUGH PROFESSIONAL PROJECT MANAGEMENT

B3-17 Ante Ravlić, Velimir Ravlić

CORRSION BEHAVIOUR OF EARTHING MAERIALS